EAA Builders Log Website
EMail address:
Password:
- Lost my password
close
EAA Builders Log
(An EAA website).
Help
Contact Us
About
Sign Up
Login
Project:
Bovine-RV14A
-
Listing of Entries
(Please mouse-over any icon to get a description of that function).
Categories
Show All Entries
- (239)
Research
- (2)
-
Laser cut parts...
-
Oshkosh recap
Workshop
- (15)
-
Fuselage rotisserie
-
Finishing kit delivery
-
Mounting TV in workshop
-
Building another...
-
New workshop table
-
Vans Lightbox Kit
-
Woodworking building...
-
Finished casters on...
-
Finished assembly of...
-
Started assembly of...
-
Finished first...
-
Started assembling...
-
Continued cutting...
-
Started cutting wood...
-
Got a wing cart
Empennage
- (1)
-
Inventory of emp kit
Fuselage
- (2)
-
Finished fuselage...
-
Fuselage kit...
Firewall
Tail Feathers
- (41)
-
Replacing LCP in rudder
-
Drilling out the...
-
Cutting elevator...
-
Starting Elevator prep
-
Finishing last...
-
Beginning to rivet...
-
Riveting lower skin...
-
Riveting top skin of HS
-
Offset riveting the...
-
Nose ribs and HS...
-
Riveting nose ribs...
-
Priming the HS skins
-
Riveting the HS ribs...
-
Counter-sinking HS...
-
Counter-sinking the...
-
Finish dimpling HS skin
-
Starting dimpling of...
-
Dimpling h-stab ribs
-
Deburring H-stab ribs
-
Riveting the H-stab...
-
Priming H-stab spar
-
Drilling,...
-
Match drilling...
-
Match drilling first...
-
Cutting spar caps...
-
H-stab spar
-
Pausing rudder and...
-
Rudder counterweight...
-
Riveting together...
-
Back-riveting the...
-
Nutplates and...
-
Starting to assemble...
-
Priming rudder parts
-
Skinwork and...
-
Prepping internal...
-
Starting on the rudder
-
Skinning the...
-
Riveting together VS...
-
Vertical stab...
-
Vertical stab match...
-
Starting work on...
Wings
- (86)
-
Moving the wings to...
-
Prepping and priming...
-
Dimpling and priming...
-
Cutting wing skin...
-
Assembling the...
-
Right aileron gap...
-
Right flap gap seal...
-
Attaching gap seals...
-
Priming gap seals
-
Attach left OBLE and...
-
Attaching left OBLE
-
Right OBLE and fuel...
-
Joining OBLE to...
-
Final bracket and...
-
Rivet party to...
-
Starting to rivet...
-
Priming,...
-
Dimpling and scuffing
-
Dimpling the wing skins
-
Match drilling top...
-
Riveting the right...
-
Assembling the right...
-
Priming rear spar...
-
Countersinking and...
-
Rear spar doublers
-
Riveting the ribs to...
-
Assembling inboard...
-
Assembling rib brackets
-
Installing snap...
-
Priming the right...
-
Prepping wing ribs...
-
Prepping parts for...
-
Finish...
-
Nutplate riveting...
-
Nutplate prep for...
-
Cutting and drilling...
-
Stall warning...
-
Fixing reversed OBLE...
-
Assembling the stall...
-
Left OBLE fully riveted
-
Starting to rivet...
-
Priming the left...
-
Scuffed and dimpled...
-
Right OBLE done
-
Resuming riveting on...
-
Nutplates and...
-
Priming Right OBLE...
-
Dimpling right OBLE...
-
Drilling and...
-
Assembling left OBLE...
-
More dimpling and...
-
More leading-edge...
-
Preparing parts for...
-
J-channel stiffener...
-
Finished the upper...
-
Flush riveting the...
-
Safety wire and...
-
Aileron hinge...
-
More wing skin...
-
Skin riveting and...
-
Starting to rivet...
-
Dimpling outboard...
-
New rear spar...
-
Aileron hinge...
-
Dimpling wing-walk...
-
Finish riveting rear...
-
Aileron bellcrank...
-
More countersinking...
-
Countersinking...
-
Attaching nutplates...
-
Rear spar dimpling...
-
Match drilling...
-
Match drilling rear...
-
Starting on the left...
-
Finished riveting...
-
Riveting the ribs to...
-
Bushings, riveting,...
-
Drilling and Priming...
-
Left wing ribs clecoed
-
Finished wing rib...
-
Countersinking spar...
-
Spar nutplates and...
-
Replacement hinge...
-
Drilling holes in my...
-
Wing kit delivery...
Flaps
- (23)
-
Finishing right flap
-
Closing up nose of...
-
Right flap trailing...
-
Finishing riveting...
-
Riveting the nose...
-
Countersink inboard...
-
Finish riveting top...
-
Started riveting on...
-
More right flap...
-
Flush riveting right...
-
More riveting of...
-
Riveting stuff to...
-
Priming and riveting...
-
Dimpling right flap...
-
Countersinking the...
-
Dimpling and...
-
Drilling and...
-
Mock assembly of the...
-
Match drilling the...
-
Left flap ribs,...
-
Prepping left flap ribs
-
Flap hinge brackets
-
Wing kit inventory...
Ailerons
- (16)
-
Finishing the left...
-
Closing up left...
-
Finishing up right...
-
Untwisting and...
-
Preparing trailing...
-
Right aileron nose...
-
Continue riveting...
-
Flush riveting nose...
-
Back riveting the...
-
Primed right aileron...
-
Left aileron skin prep
-
Right aileron nose...
-
Drilling the left...
-
Riveting aileron...
-
Continue prepping...
-
Starting on the...
Fuel Tanks
- (40)
-
Installing fittings...
-
Finishing the right...
-
Closing up the right...
-
Countersinking the...
-
Closing up the left...
-
Install vent line...
-
Water leak testing...
-
J-channel, attach...
-
Last 3 full ribs in...
-
Two more ribs down...
-
Starting to rivet...
-
Bending fuel sender...
-
Riveting last rib of...
-
Bending vent lines...
-
Installing J-channel...
-
Final ribs of left...
-
More fuel tank riveting
-
Second rib added to...
-
Starting to rivet...
-
Riveting and sealing...
-
Making replacement...
-
Fuel drain flanges...
-
Stiffeners on right...
-
Installed lower...
-
Starting the fuel...
-
More alodine...
-
Installing fuel tank...
-
Plugging fuel tank...
-
Alodine of fuel tank...
-
Alodine treatment of...
-
Cleaning fuel tank...
-
Scuffing fuel tank...
-
Close quarters...
-
Dimpling the fuel...
-
Countersinking fuel...
-
Fuel tank...
-
Fuel tank dimpling work
-
Prepping fuel tank...
-
Prepping fuel tank...
-
Fluting the fuel...
Controls
- (7)
-
Autopilot pushrods...
-
Prime and wrap up...
-
Drilling pushrods...
-
More pushrod and...
-
Riveting and priming...
-
Cutting and drilling...
-
Assembling pushrod...
Avionics
Lighting
- (4)
-
Cutting the wingtip...
-
Adding mounts for...
-
FlyLEDs control...
-
Assembling FlyLEDs...
Instrument Panel
Landing Gear
Engine
- (1)
-
Engine and prop ordered
Propeller
- (1)
-
Propeller and...
Fuel System
Interior Finish
Paint / Decals
Inspection
Tools
Builder Name:
Jeff Lawson
-
Project:
Vans - RV-14A
-
VIEW REPORTS
Total Hours:
601.5
Total Flight Time:
Start/Last Date:
Jan 28, 2022 - No Finish Date
Engine:
Lycoming YIO-390-EXP119 non-cert
Propeller:
Hartzell G2YR/N7605W-2X 74 in. dia composite 2-blade
Panel:
Dynon Skyview
Friendly URL:
https://eaabuilderslog.org?s=Bovine-RV14A
Home or Last Project Picture
Nov 21, 2022
Last 3 full ribs in right tank done
- (3.5 hours)
Category: Fuel Tanks
Tonight, I had the goal of finishing the last three full ribs in the right fuel tank. Once you get the rhythm down things can move pretty quickly.
What's next? Install the J-channel stiffener, attach bracket, and last half of the first rib.
Next rib is clecoed in
Applying additional sealant to rivets and seams
Getting ready to rivet the next rib
Riveting the next rib
View from outboard end of all full ribs installed
NOTE: This information is strictly used for the EAA Builders Log project within the
EAA organization
.
-
Policy
-
© Copyright 2024 Brevard Web Pro, Inc.